2019-21 Programmatic Minor Works

2019-21 Programmatic Minor Works

2019-21 Programmatic Minor Works List (August 2018)
Inst Rank Cost Estimate Recommended Funding Cumulative Recommendation Dept Bldg. Title & Description
1 $1,800,000 $1,800,000 $1,800,000   MB Office Space Optimization 1
  $300,000 $300,000 $300,000 ESS OM Student Outreach Services - Student Success Pkg - Confidential Advising for At-Risk Students (Rooms 380/387/390)
  $210,000 $210,000 $510,000 RCPS OM OM120 Optimization - Upgrades to relocate AG, & Risk/Compliance/Policy Services from OM320 suite to OM 120
  $750,000 $750,000 $1,260,000 ESS OM Prevention & Wellness Center - Space Allocation for Student Success Pkg (Rooms 540, 555, 560, 565, 585, 585B)
  $115,000 $115,000 $1,375,000   OM Honors Center Relocation - Relocate Honors Center from CH ground floor to OM320 suite
  $125,000 $125,000 $1,500,000 ESCI ES New Environmental Sciences Department Main Office; Creation of new Faculty Offices
  $200,000 $200,000 $1,700,000 ESS OM Academic Advising - Student Success Pkg - Confidential Offices for Advisors (Rooms 380/390)
  $100,000 $100,000 $1,800,000 CBE PH Faculty Office Construction - convert meeting rooms to faculty offices
2 $188,000 $188,000 $1,988,000 EHS MB Campus Wide Health, Safety, ADA & Code
3 $300,000 $300,000 $2,288,000 EHS MB Create Designated Areas of Rescue Assistance in stairwells with directional signage
4 $250,000 $250,000 $2,538,000 FDCB MB Create Several Gender Neutral/ADA/Family Friendly Single Stall Restrooms in Existing Academic Buildings
5 $315,000 $315,000 $2,853,000 FM PP Lock Shop Relocation (Includes 990478)
6 $100,000 $100,000 $2,953,000 FDCB LAND Pedestrian Path Lighting from Commissary to Birnam Wood
7 $75,000 $75,000 $3,028,000 FDCB LAND Create Pedestrian Path from Old Main to Engineering Technology
8 $1,300,000 $1,300,000 $4,328,000   MB Office Space Optimization 2
  $335,000 $335,000 $4,663,000 EOO OM Old Main Office Space Optimization
  $103,000 $103,000 $4,766,000 FAIR FA Faculty Office Construction - convert stage area to three enclosed offices
  $108,000 $108,000 $4,874,000 ART/DESIGN FI SPACE OPTIMIZATION  - campus-wide space optimization of administrative & office spaces
  $53,000 $53,000 $4,927,000 GEOL ES ES 114 from Preproom to shared office space
  $35,000 $35,000 $4,962,000 BIOL BI Add faculty office in BI 414
  $15,000 $15,000 $4,977,000 ENG ET Convert vending room to faculty office
  $80,000 $80,000 $5,057,000 GEOL ES Geology Office Suite Update and Renovation
  $520,000 $520,000 $5,577,000 DEAN ES Office Space Optimization - Huxley Deans Office Renovation
  $51,000 $51,000 $5,628,000 FAIR FA Faculty Office Construction - convert seminar room into two offices
9 $220,000 $220,000 $4,548,000 SPACE ADMIN HS & CA General Refurbishment
10 $289,000 $289,000 $4,837,000 ART FI Painting Studio Improvements
11 $195,000 $195,000 $5,032,000 GEOL ES ES 007 Heavy Metal Remediation
12 $25,000 $25,000 $5,057,000 DES FI New Administrative suite for the Design Department
13 $700,000 $700,000 $5,757,000   AA Art Annex Elevator
14 $150,000 $150,000 $5,907,000 FDCB LAND Wayfinding Signage Phase 1
15 $25,000 $25,000 $5,932,000 CHEM CB Install appropriate ventilation to exchange air in CB 254
16 $25,000 $25,000 $5,957,000 GEOL ES Graduate Student Office Renovation
17 $129,000 $129,000 $6,086,000 ENG ET Environmental Dust Collection and Ventilation ET 134 and ET 135
18 $50,000 $50,000 $6,136,000 ESCI ES Student Collaborative Space
19 $80,000 $80,000 $6,216,000 ENG ET Creating a Functional, Safe, Collaborative Space For Engineering & Design Students
20 $484,000 $484,000 $6,700,000 LING TBD New Linguistics Departmental Space
  $350,000     FM MB Complete Remaining Remote Utility Monitoring
  $50,000     FDCB LAND Site Improvements on High Street in Front of VU
  $100,000     ESS OM Student Records Preservation - Vault Repair & Modernization (Room 230)
  $100,000     FDCB LAND Bike System Improvements
  $200,000     FDCB LAND Landscaping at Harrington Field hillside 
  $650,000     FM SPMC Upgrade space and add new HVAC Systems
  $700,000     FM AH Energy Conservation Systems Upgrade
  $40,000     FM PH Parks Hall (return booster fan in each floors fan room to induce more effective ventilation)
  $125,000     ESS OM Career Services Remodel for Career Counseling & Competitive Employment Interviewing (Rooms 280 and 290)