2019-21 Preservation Minor Works

2019-21 Preservation Minor Works

2019-21 Preservation Minor Works List (August 2018)
Inst Rank Wag Recommended Funding Cumulative Recommendation Dept Bldg Title & Description
1 $300,000 $300,000 $300,000 EHS / FM MB Campus Wide Health, Safety, ADA &Code
2 $500,000 $500,000 $800,000 FM MB Campus Wide Infrastructure Upgrade & Renewal
3 $500,000 $470,000 $1,270,000 FM MB Campus Wide Interior Renewal (Flooring, Painting, Doors, Lecture Hall Seats)
4 $350,000 $350,000 $1,620,000 FM GRDS Campus Wide Roadway Cyclic Renewal
5 $500,000 $500,000 $2,120,000 FM ES Fume Exhaust and Supply Fan Upgrades
6 $752,000 $752,000 $2,872,000 FM MB Rekey &Upgrade locks on Interior Doors (AH, ES, ET)
7 $300,000 $300,000 $3,172,000 FM Utilities Replace sanitary sewer at Highland Hall from building to manhole at the trunk line
8 $225,000 $225,000 $3,397,000 FM MC Beach Erosion correction at Shannon Point
9 $70,000 $70,000 $3,467,000 FM GRDS Sanitary Sewer Partial Replacement at Red Square per Utility Master Plan
10 $300,000 $300,000 $3,767,000 FM PM Sea Discovery Center seawater system replaced
11 $105,000 $105,000 $3,872,000 FM BI/CB Lab Upgrades for Emergency Washing Facilities Access and Dedicated Compressed Air for ET
12 $50,000 $50,000 $3,922,000 FM MB Campus Wide Exterior Window &Wall Restoration at Multiple Buildings
13 $175,000 $175,000 $4,097,000 EHS EX Upgrade Pedestrian path dark locations
14 $250,000 $250,000 $4,347,000 FM MB Add additional Safety Fall Restraints to Roofs
15 $500,000 $500,000 $4,847,000 FM OM Refurbish Rooftop Architectural Elements
16 $150,000 $150,000 $4,997,000 FM FI Replace both condensate receivers.
17 $210,000 $210,000 $5,207,000 FM MB North Campus Storm Water Trunk Line Upgrades Near Track Building and College Hall
18 $35,000 $35,000 $5,242,000 FM MB Replace Failing Window Hinges, Operators and Seals at BI, CB, CF and AIC West
19 $240,000 $240,000 $5,482,000 FM BH Replace Rooftop Chillers Serving Server Hub
20 $70,000 $70,000 $5,552,000 FM CA Refurbish Canada House Exterior
21 $600,000 $600,000 $6,152,000 FM AA Replace Aging Low and Steep Sloped Roofs
22 $100,000 $100,000 $6,252,000 FM MB Joy-Fan Units need overhaul (OM)
23 $65,000 $65,000 $6,317,000 FM FX Fairhaven Tunnel repipe/reinsulation shared with URES.
24 $1,100,000 $1,100,000 $7,417,000 FM GRDS Replace Fairhaven Service Road Rockery
25 $800,000 $800,000 $8,217,000 FDCB GRDS Replace Aging Exterior Lighting - Ph 1
26 $125,000 $125,000 $8,342,000 FM MH Refurbish Vertical Sash Windows
27 $40,000 $40,000 $8,382,000 FM HU HU Roof drainage upgraded
28 $125,000 $125,000 $8,507,000 FM WL Replace Space (Hydronic) Heat Exchanger
29 $50,000 $50,000 $8,557,000 FM PA PAC Roof Replace above Music Offices facing High Street
30 $100,000 $100,000 $8,657,000 FM CB Replace corridor lights with LED equivalents
31 $30,000 $30,000 $8,687,000 FM CB Replace Stair Riser and Tread Covering at South Stairwell
32 $550,000 $550,000 $9,237,000 FM ET Ventilation Upgrades for Engineering Technology Admin Offices
33 $800,000 $800,000 $10,037,000 FM OM Ventilation Upgrades for North Half of Old Main
34 $1,255,000 $1,255,000 $11,292,000 FM PAC Upgrade Electronic Safety and Security System
35 $80,000 $80,000 $11,372,000 FM SP Boiler #3 Controls Upgrade and Generator Connect
36 $141,000 $141,000 $11,513,000 FM PP Upgrade Paint Fume Extraction for Paint Shop
37 $115,000 $115,000 $11,628,000 FM HS Refurbish High Street Hall Exterior
38 $172,000 $172,000 $11,800,000 FM PH Replace Failing Exhaust Fan Heat Recovery Unit
39 $200,000 $200,000 $12,000,000 FM GRDS Replace Hazardous Site Stairs &Steep Ramps
  $80,000     FM MB Tuck Pointing, Brick Sealing and Trim painting
  $40,000     FM MB Install Barrier Matting - HH, BH, CH ET AH, HU OM
  $630,000     FM FI Replace Western Gallery Heating and Cooling System
  $275,000     FM SPMC Upgrade Electronic and Security Systems
  $1,700,000     FM CB Refurbish Fume Hoods and HVAC Controls
  $120,000     FM GRDS Repair Edging at Fairhaven College Courtyard
  $1,345,000     FM Utilities Replace Steam Piping at Ridgeway - Phase 2
  $40,000     FM AIC east Prevent Black Full Height Staining at Ext Pre-Cast Concrete Walls
  $75,000     FM MB Replace Damaged Suspended Ceilings (PH Plaza lobby, PAC, ES 5th Fl in SE corner)
  $32,000     FM Utilities Selective Water Main Replacement
  $750,000     FM MB Upgrade Electronic Safety and Security Systems (ET, SP, PP)
  $1,000,000     FM ES Waterproof Exterior Walls and Reseal and Replace Windows at Eastern 3 sides
  $50,000     FM OM Interior Door Re-Keying - Replace obsolete locksets at approximately 10% of locations
  $30,000     FM LAND Red Square stair replacement
  $25,000     FM MB Signage on doors resecured
  $1,000,000     FM OM Upgrade Electronic Safety and Security System
  $205,000     FM Utilities Locking Access to Electrical and Communication Utility Nodes on Campus
  $383,000     FM UT Replace Steam Isolation Valves
  $50,000     FM BH Upgrade plumbing isolation valves for improved maintenance
  $100,000     FM LAND Retaining wall for East College at AIC Corner
  $1,190,000     FM GRDS Replace Brick Paving (Oval walk near CF; sink hole Haskel Plaza walkway, memory walk)
  $500,000     FM LAND All Weather Play Field synthetic turf replacement.
  $200,000     FM FI Replace floor tiles containing asbestos
  $300,000     FM Utilities Refurbish South College Way sanitary sewer line from FA to Bill McD Parkway
  $600,000     FM CB Upgrade to fire rated corridor glazing and deactivate East Corridor Deluge Fire Protection System
  $300,000     FDCB GRDS Widen Brick Pathways