1 |
$300,000 |
$300,000 |
$300,000 |
EHS / FM |
MB |
Campus Wide Health, Safety, ADA &Code |
2 |
$500,000 |
$500,000 |
$800,000 |
FM |
MB |
Campus Wide Infrastructure Upgrade & Renewal |
3 |
$500,000 |
$470,000 |
$1,270,000 |
FM |
MB |
Campus Wide Interior Renewal (Flooring, Painting, Doors, Lecture Hall Seats) |
4 |
$350,000 |
$350,000 |
$1,620,000 |
FM |
GRDS |
Campus Wide Roadway Cyclic Renewal |
5 |
$500,000 |
$500,000 |
$2,120,000 |
FM |
ES |
Fume Exhaust and Supply Fan Upgrades |
6 |
$752,000 |
$752,000 |
$2,872,000 |
FM |
MB |
Rekey &Upgrade locks on Interior Doors (AH, ES, ET) |
7 |
$300,000 |
$300,000 |
$3,172,000 |
FM |
Utilities |
Replace sanitary sewer at Highland Hall from building to manhole at the trunk line |
8 |
$225,000 |
$225,000 |
$3,397,000 |
FM |
MC |
Beach Erosion correction at Shannon Point |
9 |
$70,000 |
$70,000 |
$3,467,000 |
FM |
GRDS |
Sanitary Sewer Partial Replacement at Red Square per Utility Master Plan |
10 |
$300,000 |
$300,000 |
$3,767,000 |
FM |
PM |
Sea Discovery Center seawater system replaced |
11 |
$105,000 |
$105,000 |
$3,872,000 |
FM |
BI/CB |
Lab Upgrades for Emergency Washing Facilities Access and Dedicated Compressed Air for ET |
12 |
$50,000 |
$50,000 |
$3,922,000 |
FM |
MB |
Campus Wide Exterior Window &Wall Restoration at Multiple Buildings |
13 |
$175,000 |
$175,000 |
$4,097,000 |
EHS |
EX |
Upgrade Pedestrian path dark locations |
14 |
$250,000 |
$250,000 |
$4,347,000 |
FM |
MB |
Add additional Safety Fall Restraints to Roofs |
15 |
$500,000 |
$500,000 |
$4,847,000 |
FM |
OM |
Refurbish Rooftop Architectural Elements |
16 |
$150,000 |
$150,000 |
$4,997,000 |
FM |
FI |
Replace both condensate receivers. |
17 |
$210,000 |
$210,000 |
$5,207,000 |
FM |
MB |
North Campus Storm Water Trunk Line Upgrades Near Track Building and College Hall |
18 |
$35,000 |
$35,000 |
$5,242,000 |
FM |
MB |
Replace Failing Window Hinges, Operators and Seals at BI, CB, CF and AIC West |
19 |
$240,000 |
$240,000 |
$5,482,000 |
FM |
BH |
Replace Rooftop Chillers Serving Server Hub |
20 |
$70,000 |
$70,000 |
$5,552,000 |
FM |
CA |
Refurbish Canada House Exterior |
21 |
$600,000 |
$600,000 |
$6,152,000 |
FM |
AA |
Replace Aging Low and Steep Sloped Roofs |
22 |
$100,000 |
$100,000 |
$6,252,000 |
FM |
MB |
Joy-Fan Units need overhaul (OM) |
23 |
$65,000 |
$65,000 |
$6,317,000 |
FM |
FX |
Fairhaven Tunnel repipe/reinsulation shared with URES. |
24 |
$1,100,000 |
$1,100,000 |
$7,417,000 |
FM |
GRDS |
Replace Fairhaven Service Road Rockery |
25 |
$800,000 |
$800,000 |
$8,217,000 |
FDCB |
GRDS |
Replace Aging Exterior Lighting - Ph 1 |
26 |
$125,000 |
$125,000 |
$8,342,000 |
FM |
MH |
Refurbish Vertical Sash Windows |
27 |
$40,000 |
$40,000 |
$8,382,000 |
FM |
HU |
HU Roof drainage upgraded |
28 |
$125,000 |
$125,000 |
$8,507,000 |
FM |
WL |
Replace Space (Hydronic) Heat Exchanger |
29 |
$50,000 |
$50,000 |
$8,557,000 |
FM |
PA |
PAC Roof Replace above Music Offices facing High Street |
30 |
$100,000 |
$100,000 |
$8,657,000 |
FM |
CB |
Replace corridor lights with LED equivalents |
31 |
$30,000 |
$30,000 |
$8,687,000 |
FM |
CB |
Replace Stair Riser and Tread Covering at South Stairwell |
32 |
$550,000 |
$550,000 |
$9,237,000 |
FM |
ET |
Ventilation Upgrades for Engineering Technology Admin Offices |
33 |
$800,000 |
$800,000 |
$10,037,000 |
FM |
OM |
Ventilation Upgrades for North Half of Old Main |
34 |
$1,255,000 |
$1,255,000 |
$11,292,000 |
FM |
PAC |
Upgrade Electronic Safety and Security System |
35 |
$80,000 |
$80,000 |
$11,372,000 |
FM |
SP |
Boiler #3 Controls Upgrade and Generator Connect |
36 |
$141,000 |
$141,000 |
$11,513,000 |
FM |
PP |
Upgrade Paint Fume Extraction for Paint Shop |
37 |
$115,000 |
$115,000 |
$11,628,000 |
FM |
HS |
Refurbish High Street Hall Exterior |
38 |
$172,000 |
$172,000 |
$11,800,000 |
FM |
PH |
Replace Failing Exhaust Fan Heat Recovery Unit |
39 |
$200,000 |
$200,000 |
$12,000,000 |
FM |
GRDS |
Replace Hazardous Site Stairs &Steep Ramps |
|
$80,000 |
|
|
FM |
MB |
Tuck Pointing, Brick Sealing and Trim painting |
|
$40,000 |
|
|
FM |
MB |
Install Barrier Matting - HH, BH, CH ET AH, HU OM |
|
$630,000 |
|
|
FM |
FI |
Replace Western Gallery Heating and Cooling System |
|
$275,000 |
|
|
FM |
SPMC |
Upgrade Electronic and Security Systems |
|
$1,700,000 |
|
|
FM |
CB |
Refurbish Fume Hoods and HVAC Controls |
|
$120,000 |
|
|
FM |
GRDS |
Repair Edging at Fairhaven College Courtyard |
|
$1,345,000 |
|
|
FM |
Utilities |
Replace Steam Piping at Ridgeway - Phase 2 |
|
$40,000 |
|
|
FM |
AIC east |
Prevent Black Full Height Staining at Ext Pre-Cast Concrete Walls |
|
$75,000 |
|
|
FM |
MB |
Replace Damaged Suspended Ceilings (PH Plaza lobby, PAC, ES 5th Fl in SE corner) |
|
$32,000 |
|
|
FM |
Utilities |
Selective Water Main Replacement |
|
$750,000 |
|
|
FM |
MB |
Upgrade Electronic Safety and Security Systems (ET, SP, PP) |
|
$1,000,000 |
|
|
FM |
ES |
Waterproof Exterior Walls and Reseal and Replace Windows at Eastern 3 sides |
|
$50,000 |
|
|
FM |
OM |
Interior Door Re-Keying - Replace obsolete locksets at approximately 10% of locations |
|
$30,000 |
|
|
FM |
LAND |
Red Square stair replacement |
|
$25,000 |
|
|
FM |
MB |
Signage on doors resecured |
|
$1,000,000 |
|
|
FM |
OM |
Upgrade Electronic Safety and Security System |
|
$205,000 |
|
|
FM |
Utilities |
Locking Access to Electrical and Communication Utility Nodes on Campus |
|
$383,000 |
|
|
FM |
UT |
Replace Steam Isolation Valves |
|
$50,000 |
|
|
FM |
BH |
Upgrade plumbing isolation valves for improved maintenance |
|
$100,000 |
|
|
FM |
LAND |
Retaining wall for East College at AIC Corner |
|
$1,190,000 |
|
|
FM |
GRDS |
Replace Brick Paving (Oval walk near CF; sink hole Haskel Plaza walkway, memory walk) |
|
$500,000 |
|
|
FM |
LAND |
All Weather Play Field synthetic turf replacement. |
|
$200,000 |
|
|
FM |
FI |
Replace floor tiles containing asbestos |
|
$300,000 |
|
|
FM |
Utilities |
Refurbish South College Way sanitary sewer line from FA to Bill McD Parkway |
|
$600,000 |
|
|
FM |
CB |
Upgrade to fire rated corridor glazing and deactivate East Corridor Deluge Fire Protection System |
|
$300,000 |
|
|
FDCB |
GRDS |
Widen Brick Pathways |